Application:
Industrial Water
Keywords:
Arizona, industrial , surge pond, DO, blue green algae, water quality
Reservoir Size:
This is a wastewater 100% reclaimed water surge pond of 38.57 acres
SolarBee Installation:
Date: 3/31/2006 Installed 2 SB10000v12 units
Project Objectives:
Objective: Improve dissolved oxygen levels, control blue-green algae blooms, and improve overall water quality.
For more information on this or any other SolarBee installation, please call 866 437 8076.
Copyright 2012 SolarBee, Inc.
^
