Application:
Industrial Water
Keywords:
Colorado, industrial, evaporation pond, odors
Reservoir Size:
This is an industrial evaporation pond installation of 49.89 acres
SolarBee Installation:
Date: 7/18/2005 Installed 2 SB10000v12 units
Project Objectives:
Objective: To prevent odor events by continually de-gassing the lower depths of the pond and to prevent H2S buildup due to stratification.
For more information on this or any other SolarBee installation, please call 866 437 8076.
Copyright 2012 SolarBee, Inc.
^
