Application:
Industrial Water
Keywords:
California, industrial, winery, wastewater, industrial, performance enhancement
Reservoir Size:
Four cell system totaling 1.41 acres
SolarBee Installation:
Date: 4/12/2002 Installed one SB10000 in cell one, and one SB10000DM in cell three.
Project Objectives:
Objective: To enhance the performance of the existing partial mix ponds at the winery wastewater treatment facility.
For more information on this or any other SolarBee installation, please call 866 437 8076.
Copyright 2012 SolarBee, Inc.
^
